Mayo Creek Restoration Committee Meeting Minutes 9/28/16
Present: John Riehl, John Portnoy, Jake Puffer, Walter Baron, Pat Winslow; 5:00 PM
-Motion to approve minutes from 7/27/16 John Portnoy, Second Jake Puffer, pass 5-0
-Discussion of possible modeling outcomes,
-How groundwater would be effected by tidal restoration
-Larry Martin has indicated that evidence suggests an increase in Mean Tide Level would increase ground water level.
-Surveying of low lying properties indicates restoration would be limited to below 1.5ft NAVD88 to avoid present structures.
-Modeling will not convey water quality for drinking water in private wells.
-What restoration can be accomplished with a modification of the existing culvert?
-Tidal Gate
-Bigger pipe with dredging and addition of side channels could lower Mean Tide Level
-Is amount of restoration achieved worth the cost?
-Monitoring needs
-Tide height
-Groundwater level
-Drinking water
-John Portnoy suggested to hire a consulting hydrologist to put together the NOI
-Funding
-Benefits of Nitrogen mediation
- possibly less frequent dredging
-Salt marsh Carbon sequestration?
-John Riehl will prepare a presentation for the Harbor Conference
-History of Mayo Creek
-HVCC request of all documents related to the Mayo Creek Restoration
-Motion to Adjourn 6:25 Walter Baron, second Pat Winslow, pass 5-0
***********
Approved October 27 2016, 5-0
October 30 2016
John Riehl